Site assessment checklist for an e-bike station
The same ground a Colibrino site walk covers, as 21 checks you can work through on your own property before the walk.
For: Property managers, HOA boards, campus offices and neighborhood groups

Checklist
Much of what makes a station busy or quiet is settled before anything is installed. This checklist covers the same ground as a Colibrino site walk: where riders come from, how they reach the street, power, ground, wind, snow, light, rules and people. Use it to look at a candidate spot before the walk, to compare two spots, or to keep a record of what has been confirmed. It has 21 items in five groups.
How to use the checklist
Stand at the spot you have in mind and work down the list. Tick each item you can confirm; the counter shows how many of the 21 are confirmed. Print the list or download it as a CSV file for your records, and use a fresh copy for each candidate spot.
An unticked item is not a failure. It is a question for the site walk, the electrician, the board or the fire marshal.
The five groups
Location and access (5 items)
A station works best on the line people already walk, close to the main entrances riders use. It must sit on land the property owner controls, or have written permission. Riders should reach a street, path or bike lane without crossing a parking aisle where cars back out. The station and its bikes must keep sidewalks, ramps, fire lanes and doors clear, and leave emergency vehicle access and hydrants unobstructed. The U.S. Access Board’s guide to accessible routes describes a minimum continuous clear width of 36 inches and notes that elements such as protruding objects cannot reduce it; a station and its parked bikes should never narrow that route.
Power and surface (4 items)
An outlet or panel with spare capacity should be within reach, and an electrician should have looked at it. The circuit has to carry the charging load with margin: in the fictional Larkspur Commons example, 8 bikes draw 800 W, 41.7% of a 20-amp, 120-volt circuit’s 1,920 W planning limit. Run your own numbers in the station power calculator. The ground should be level, paved and drain away from the bays, and it should either take anchors or suit a ballasted base.
Weather and light (4 items)
Note the prevailing wind and where snow drifts at the spot. At the Cheyenne airport, the National Weather Service recorded an average wind speed of 11.3 mph in 2025 and a highest gust of 75 mph, against a normal annual snowfall of 62.9 inches (the 1991 to 2020 normal). The Wyoming State Climate Office notes that a 4 by 8 foot sheet of plywood takes 245 pounds of wind pressure at 50 mph at sea level, a reminder that anything flat at a station, such as a sign, catches a lot of wind. Snow crews should know where the station is and keep a path to it. The spot should be lit at night and visible from windows or a camera, which discourages tampering.
Rules and approvals (4 items)
Collect the HOA, lease, campus or city rules that apply to the spot, and identify any permit or design review the location needs. Tell the property insurer about the planned station. Confirm fire safety requirements for charging equipment with the fire marshal where required. A station on a public street or sidewalk needs a city agreement first.
People (4 items)
Name one contact on the host side. Ask residents or students where they would ride. Make sure maintenance staff know who to call about the station. Choose a launch date that avoids move-in week and the first snow.
Example (fictional). At Larkspur Commons, a fictional 240-home apartment community, the site walk found two lobby doors used by nearly everyone and a third, quieter door by the pool. The network plan put a station of 8 bays beside each lobby door and left the pool door for a later season. See the full example network.
Reading your result
The count is not a score. A few items decide whether a spot works at all: control of the land, reachable power and a clear path for people on foot. Others, such as lighting or a snow route, can usually be fixed. When a walk shows that a spot is not a good fit yet, the network plan says so plainly and lists what would have to change.
Limits
This is a planning checklist, not an engineering, electrical or code review. The electrician, the insurer, the fire marshal and the local authority each decide their own part.
What to do next
Read what happens on a walk on station planning, and how wind and winter shape the plan on seasonal operations. The how we work page shows the six stages from site walk to season review. When you are ready, plan a station: every Colibrino program starts with a site walk.
Start with one station.
Tell us about the place: how many homes or beds, where people come and go, and where the nearest outlet is. We reply with questions or a time to walk the site with you.